Submersible Drainage Pumps
Compare inlet design, minimum operating depth and discharge size for the pit or standing water.
Submersible Drainage Pumps at a glance: Compare inlet design, minimum operating depth and discharge size for the pit or standing water. Check whether the model is approved for the liquid and intended duty.
- Related equipment
- View comparison
- Buyer questions
- 4 answered
Side-by-side
Related equipment
| Equipment type | Where it fits |
|---|---|
| Dewatering Pumps | Choose around water condition, target drawdown and discharge route. Compare solids passage, suction limitations and duty rating with the site conditions. |
| Irrigation Pumps | Start with the flow and pressure needed by the largest zone running at one time. Add losses between the source, pump and farthest outlet when selecting a duty point. |
Buying guide
Submersible Drainage Pumps: what to know before you buy
Compare inlet design, minimum operating depth and discharge size for the pit or standing water.
How to choose
- Measure the pit at switching height. Record the narrowest inside dimension, inlet level and discharge direction. Compare the switch movement and space occupied by the discharge elbow as well as the pump body.
- Find the duty point. Write down required delivery flow and total head, including changes in elevation and friction. For some systems that point changes through the season or as the water level falls. Review more than a single condition on the curve.
- Plan access after installation. Allow room for strainers, valves, fittings and removal of service parts. Check how staff will inspect or retrieve the pump under the conditions of the actual site.
- Specify the working point. Describe where the water starts and where it must arrive. Give each supplier the same elevation, line dimensions, fittings and required flow. Compare their proposed operating points and any assumptions about the site.
FAQ
Submersible Drainage Pumps questions
Will the float work in a narrow pit?
Measure space for the float to travel and its on and off levels. Compare vertical controls where a tethered float lacks room.
Which service details matter?
Check cable length, access to the strainer and the method specified for lifting and retrieval. Verify power and protection requirements for the installation.
How much water remains after pumping?
Compare the published shutoff level and permissible operating range for the selected switch. Use the actual pit dimensions to estimate water left between cycles.
What information goes on a pump quotation?
Include the liquid, solids if present, expected run time, available power, pipe or hose layout and duty point. Request the performance curve for the exact configuration offered.