Pumps & Water Management
Select a pump at the combination of flow and total head your system needs. Water type, solids, run time and access for service narrow the choices.
Pumps & Water Management at a glance: Trace the route from water source to discharge. Record elevation change, hose or pipe length, fittings and the desired flow so you can compare actual points on pump curves.
- Equipment types
- 3
- Equipment types at a glance
- View comparison
- Buyer questions
- 7 answered
Side-by-side
Equipment types at a glance
| Equipment | When to consider it |
|---|---|
| Dewatering Pumps | Choose around water condition, target drawdown and discharge route. Compare solids passage, suction limitations and duty rating with the site conditions. |
| Submersible Drainage Pumps | Compare inlet design, minimum operating depth and discharge size for the pit or standing water. Check whether the model is approved for the liquid and intended duty. |
| Irrigation Pumps | Start with the flow and pressure needed by the largest zone running at one time. Add losses between the source, pump and farthest outlet when selecting a duty point. |
Buying guide
Pumps & Water Management: what to know before you buy
Select a pump at the combination of flow and total head your system needs. Water type, solids, run time and access for service narrow the choices.
How to choose
- Specify the working point. Describe where the water starts and where it must arrive. Give each supplier the same elevation, line dimensions, fittings and required flow. Compare their proposed operating points and any assumptions about the site.
- Find the duty point. Write down required delivery flow and total head, including changes in elevation and friction. For some systems that point changes through the season or as the water level falls. Review more than a single condition on the curve.
- Plan access after installation. Allow room for strainers, valves, fittings and removal of service parts. Check how staff will inspect or retrieve the pump under the conditions of the actual site.
- Quote the discharge point. Describe the water source, debris, vertical rise and hose route. Ask the supplier to show expected flow at the discharge point for that arrangement. A larger outlet alone does not establish how quickly the site will drain.
- Measure the pit at switching height. Record the narrowest inside dimension, inlet level and discharge direction. Compare the switch movement and space occupied by the discharge elbow as well as the pump body.
- Size for a real irrigation zone. List the emitters or sprinkler heads that run together and the pressure required at the far end. Include changes in elevation and pipe runs. Ask the supplier to identify that operating point on the pump curve.
FAQ
Pumps & Water Management questions
Clear-water or trash pump?
Debris size and concentration matter. Compare the maker’s allowable solids and clean-out access with the water you expect to move.
Will the float work in a narrow pit?
Measure space for the float to travel and its on and off levels. Compare vertical controls where a tethered float lacks room.
What information should I bring to a supplier?
Record water level, elevation changes, pipe sizes, zone flow and required outlet pressure. Include how the source varies through the season.
What information goes on a pump quotation?
Include the liquid, solids if present, expected run time, available power, pipe or hose layout and duty point. Request the performance curve for the exact configuration offered.
Which hose and couplings come with the pump?
Ask for an itemized package covering the intake where applicable, strainer, discharge line and fittings. Verify lengths and connection types against your existing kit.
How much water remains after pumping?
Compare the published shutoff level and permissible operating range for the selected switch. Use the actual pit dimensions to estimate water left between cycles.
What happens if I add another zone later?
An additional zone run separately has different requirements from one running simultaneously. Give the supplier both schedules so the expansion has a defined design target.