Irrigation Pumps
Start with the flow and pressure needed by the largest zone running at one time.
Irrigation Pumps at a glance: Start with the flow and pressure needed by the largest zone running at one time. Add losses between the source, pump and farthest outlet when selecting a duty point.
- Related equipment
- View comparison
- Buyer questions
- 4 answered
Side-by-side
Related equipment
| Equipment type | Where it fits |
|---|---|
| Dewatering Pumps | Choose around water condition, target drawdown and discharge route. Compare solids passage, suction limitations and duty rating with the site conditions. |
| Submersible Drainage Pumps | Compare inlet design, minimum operating depth and discharge size for the pit or standing water. Check whether the model is approved for the liquid and intended duty. |
Buying guide
Irrigation Pumps: what to know before you buy
Start with the flow and pressure needed by the largest zone running at one time.
How to choose
- Size for a real irrigation zone. List the emitters or sprinkler heads that run together and the pressure required at the far end. Include changes in elevation and pipe runs. Ask the supplier to identify that operating point on the pump curve.
- Find the duty point. Write down required delivery flow and total head, including changes in elevation and friction. For some systems that point changes through the season or as the water level falls. Review more than a single condition on the curve.
- Plan access after installation. Allow room for strainers, valves, fittings and removal of service parts. Check how staff will inspect or retrieve the pump under the conditions of the actual site.
- Specify the working point. Describe where the water starts and where it must arrive. Give each supplier the same elevation, line dimensions, fittings and required flow. Compare their proposed operating points and any assumptions about the site.
FAQ
Irrigation Pumps questions
What information should I bring to a supplier?
Record water level, elevation changes, pipe sizes, zone flow and required outlet pressure. Include how the source varies through the season.
Is maximum flow a useful rating?
It is one point on the curve. Compare expected flow at your required head and confirm that the pump’s operating range suits the irrigation schedule.
What happens if I add another zone later?
An additional zone run separately has different requirements from one running simultaneously. Give the supplier both schedules so the expansion has a defined design target.
What information goes on a pump quotation?
Include the liquid, solids if present, expected run time, available power, pipe or hose layout and duty point. Request the performance curve for the exact configuration offered.